Welcome to visit Anhui Agricultural Science Bulletin!

Analysis on stable and high yield cultivation techniques of snow peach

  • Chen Zirong
Expand
  • Yansi Town Service Center for the People of Huizhou District, Huangshan 245000, China

Received date: 2025-04-15

  Online published: 2026-04-14

Abstract

The stable and high yield cultivation techniques of snow peach from 5 aspects were summarized: orchard construction and planting, soil and fertilizer-water management, shaping and pruning, flower and fruit management, as well as disease and pest control. For orchard construction and planting, sandy loam with good air permeability and organic matter content ≥1% are selected; high quality seedlings with good growth and no pests or diseases are adopted, with a planting spacing of 4 m×4 m on flat land and 3 m×4 m on mountainous or hilly land. For soil and fertilizer-water management, the soil is deeply ploughed to 50–60 cm before planting; precise fertilization (combining base fertilizer and topdressing) and irrigation (such as furrow irrigation and hole irrigation) are carried out according to different growth stages. In shaping and pruning, pruning is performed based on tree age, with young tree pruning focusing on main branch training. For flower and fruit management, flower and fruit thinning is conducted in stages, bagging is applied from mid-May to early June, and bags are removed 15 days before planned harvesting. In disease and pest control, an integrated management strategy is adopted, including agricultural measures (e.g., removing diseased fruits and branches), physical methods (e.g., trapping adults with black light lamps), and chemical applications (e.g., using biogenic pesticides). This paper provides a reference for the large-scale production of snow peach.

Cite this article

Chen Zirong . Analysis on stable and high yield cultivation techniques of snow peach[J]. Anhui Agricultural Science Bulletin, 2026 , 32(7) : 63 -65 . DOI: 10.16377/j.cnki.issn1007-7731.2026.07.016

雪桃是优质晚熟果树品种。随着种植规模的不断扩大,其在种植过程中存在产量不稳定、果实品质参差不齐等问题,这制约了雪桃产业的可持续发展。雪桃适宜种植在海拔1 500~2 500 m、年均气温(10±2) ℃、年均降水量700~1 300 mm的温带地区[1]。尤其适合在光照充足、排水良好的砂壤土中生长。果实生育期一般在200 d以上,受当地气候条件影响,不同地区雪桃生长期存在差异,但多在10月中下旬至11月上旬成熟上市。雪桃果实大,平均单果重约500 g,最大可在1 000 g以上,果形美观,口感脆甜,维生素C含量丰富,耐储藏,适合长距离运输销售,市场价值较高[2]。雪桃增产提质方面,杨继刚等[3]研究表明,增施有机肥有助于提高雪桃的产量和果实品质,从而实现其稳产高产。雪桃不同生长阶段对水分、养分的需求不同,郑雪松等[4]研究表明,运用水肥一体化技术能满足雪桃生长阶段的水肥管理需求,不仅能提高水肥利用率,还能达到增产提质的目的。因此,采用合理的种植管理技术是实现雪桃稳产高产的关键。基于此,本文从雪桃园地选择规划、栽植密度、土壤改良、水肥一体化、整形修剪、花果管理以及病虫害防治等方面提出一套适合安徽省黄山市徽州区雪桃稳产高产的种植技术策略,以期为扩大雪桃生产规模与提高生产效益提供参考。

1 建园与栽植

1.1 园地选择与规划

园地选择透气性好、有机质含量≥1%的砂质壤土,且地块需交通便利、水源充足,以向阳缓坡或平地为宜[2]。结合研究区丘陵山地多、降水充沛且土壤偏酸的特点,选址时优先选择山麓缓坡与河谷砂壤地带。因雪桃耐涝性差,根部易受淹害,需设置排水沟。在平地以南北方向栽植最为适宜,在山地或丘陵地栽植行向应与等高线一致,且园地内需配套完善的灌溉与排水设施[5]

1.2 栽植管理

选用生长状况良好、根系发达、苗高0.8~1.2 m,且无病虫害的优质苗木。结合研究区多雨湿润气候,定植时适当抬高定植穴,增强排水防涝能力。为保证雪桃树体透光性及机械在植株间正常作业,平地栽植间距4 m×4 m,山地或丘陵地栽植间距3 m×4 m。每年11月至次年1月栽植雪桃,采用挖塘或挖沟方式进行定植,将农家肥与土壤混合分层填入离地面30 cm处,把雪桃苗木放入塘(沟)内,再进行回填,回填土应高于地表约20 cm或嫁接口以下,覆土压实,随即浇足定根水,覆膜完成定植[2]

2 土壤及肥水管理

2.1 土壤管理

种植前深翻土壤,翻耕深度在50~60 cm。针对研究区贫瘠或盐碱化土壤,可增施有机肥以增加土壤中有机质含量。在幼树期覆盖地膜或秸秆,增强土壤的保温保水能力[6]。在生长期间及时进行中耕除草作业。此外,合理规划间作作物,不仅显著提高土地利用率,还可有效抑制杂草滋生,进一步优化土壤结构,为雪桃的持续稳产高产提供有力保障。

2.2 肥水管理

针对雪桃不同生长期的养分需求,采用基肥与追肥相结合的方式施肥[7]。基肥以有机肥为主,结合秋耕,通过放射沟、环状沟、扇形坑等方式施入[8];追肥主要在早春开花阶段施用促花肥,在果实硬核期前施用以氮肥为主的坐果肥。当果实进入快速生长阶段后,再次施用以氮、钾肥为主的果实膨大肥,并确保钾肥的充足供应,以保证雪桃的果实品质和产量提升。此外,根据其生长状况,适时喷洒叶面肥和微量元素肥料。
雪桃在萌芽期、果实膨大期、采收后及越冬前等关键时期,水分的充足供给至关重要。干旱季节,采用沟灌、穴灌、滴灌等节水灌溉方式,每月至少补水一次[2];雨季或遇连续降雨时及时排水,以防根系缺氧腐烂。此外,综合考虑研究区气候条件、土壤墒情等因素,采用合理的灌溉方式,实施精准灌溉,促进雪桃在各生长发育阶段有效吸收水分和养分[4]

3 整形修剪

3.1 整形

雪桃整形应根据树龄、树势及生长发育阶段进行适当调整,以三主枝自然开心形为核心树形,兼顾通风透光和稳产高产目标。结合研究区山地光照不均特点,适当加大主枝开张角度,提升受光率。整形的关键:定植时定干高在45~50 cm,主枝的分枝角度维持在70°左右,且每个主枝保留有3个顺向的侧枝,这些侧枝的角度约为80°[6]

3.2 修剪

雪桃不同树龄需采用不同的修剪方法。在幼树期修剪以整形培养主枝为主,从距离地面60 cm处开始修剪,保留此部位下方6~10个饱满芽,去除多余的芽。当新梢生长至30 cm左右时,选取3个生长均衡、开张角度适宜的壮枝作为主枝,其余枝条进行摘心以控生长,疏除病弱枝、背下枝和下垂枝,保留健壮的结果枝,以构建雪桃树体骨架,避免因研究区降水偏多、湿度较大而引发枝叶徒长与病害滋生。在初果期修剪时需平衡扩冠与结果,疏剪主枝上多余的枝条,轻截中枝,短枝不予修剪。盛果期需重点维稳树势,疏剪外围过密枝及旺盛顶端枝[2]。衰老期修剪强度应根据其树体状况调整,适当修剪结果枝,将其缩剪至健壮分枝处,以促进新枝萌发。

4 花果管理

4.1 疏花疏果

雪桃是自花结果能力强且成花率高的品种,通过疏花疏果能有效提升优质果的产量[9]。研究区疏花作业贯穿整个花期,在盛花初期,主要疏除早花、迟花、畸形花以及朝天花,保留健康花蕾,以维持枝条空间均匀分布。研究区疏果工作分2次进行,第1次在花后20~25 d实施,重点清除小果、裂果、畸形果、病虫果等,保留优质果;第2次在硬核期前完成定果,依据不同果枝的生长情况,长果枝保留3果、中果枝保留2果、短果枝保留1果[10]

4.2 套、解袋及采收

套袋时间通常为5月中旬至6月上旬,即果实硬核后期,根据树势定果后完成套袋操作[2]。在套袋前及时喷洒相应的杀虫、杀菌剂,尽量在药液干燥后当天完成套袋工作。结合研究区梅雨期多雨高湿的气候特点,套袋后需检查袋体密封性,防止雨水渗入引发果面病害。解袋时间通常在计划采收前15 d,雪桃皮呈乳黄色且无绒毛时,选择晴朗天气的早晨或傍晚撕开袋底,2~3 d后去除套袋。采收过程中佩戴专用手套轻摘轻放,采摘后套上无毒网袋,放置于带隔板的包装箱中,并存放于阴凉通风处[2]

5 病虫害防治

在整个生长周期雪桃极易遭受病虫害为害,如缩叶病、流胶病、细菌性穿孔病以及桃蛀螟、桃蚜等,采取“预防为主,综合防治”的方针,构建以农业防治为基础,生物防治为核心,化学、物理防治为补充的综合防治技术体系[1]
农业防治方面,首先注重增强雪桃树势,关键措施包括及时剪除病虫枝、僵果、腐果以及病皮和落叶枯草等;其次,增施有机肥,同时配合科学合理的修剪方式,确保果树通风透光,从而增强其抗病性;针对流胶病等湿敏病害,田间及时进行排水疏通预防。
物理防治方面,利用害虫趋光性,使用黑光灯、频振式杀虫灯等装置诱杀成虫;利用害虫对食物的趋向性,使用糖醋液作为诱饵捕杀梨小食心虫、桃蛀螟等害虫[6]
生物防治方面,保护或引入害虫的天敌以及利用细菌、真菌、病毒等微生物和代谢产物等防治病虫害,实现绿色防控与生态调控[1]。如在雪桃园中释放赤眼蜂防治桃蛀螟和梨小食心虫[6]
化学防治方面,根据病虫害发生时期合理选择药剂,确保防治的安全性和有效性。在病虫害发生高峰期,选用百菌清、甲氰菊酯等低毒、低残留农药。同时,应遵守NY/T 393—2020《绿色食品农药使用准则》,施用生物源农药和矿物源农药,禁止施用高毒高残留农药[6]

6 结语

本文从建园与栽植、土壤及肥水管理、整形修剪、花果管理和病虫害防治方面总结了雪桃稳产高产种植技术。选择透气性好、有机质足的砂质壤土,并采用挖塘或挖沟方式进行定植;种植前期深翻改土,根据雪桃的生长阶段精准施肥,及时供、排水;按树龄整形修剪,疏除病弱枝,保留健康的结果枝;分阶段进行疏花疏果,套袋通常在5月中旬至6月上旬进行;采取“预防为主,综合防治”的方针综合防治病虫害,各环节紧密配合,形成一套合理的栽培技术体系。未来,随着技术的不断创新,应不断优化栽培技术,以实现雪桃产业的可持续发展。
[1]
李瑞,孙学海,韩腾,等. 冬桃病虫害的发生与综合防治技术研究[J]. 农村实用技术2023(10):101-102.

[2]
和烨光. 丽江雪桃优质丰产栽培技术要点[J]. 江西农业2020(8):1,3.

[3]
杨继刚,李正强,和丽娟,等. 施用不同商品有机肥对丽江雪桃产量和品质的影响[J]. 农业科技通讯2022(5):199-201.

[4]
郑雪松,李树森,王晓旭,等. 基于物联网的雪桃智能水肥一体化应用技术[J]. 现代农业科技2020(5):157-160,163.

[5]
陈玉星,唐明文,刘新文,等. 优质丽江雪桃标准化生产管理技术[J]. 南方农业202014(27):24-25,29.

[6]
周洪艳,薛红燕. 金乡县雪桃无公害生产技术[J]. 果农之友2022(6):24-27.

[7]
龙兴智. 丽江雪桃施肥技术研究[J]. 农业科技通讯2021(11):198-200.

[8]
和燕苹,李志春. 绿色雪桃种植技术初探[J]. 云南农业201731(12):37-39.

[9]
蒯彦. 丽江雪桃栽培技术[J]. 云南农业201933(6):69-71.

[10]
张弘智,刘艳,叶仕安,等. 丽江雪桃在贵阳市花溪区的引种表现及其配套栽培技术[J]. 乡村科技202314(7):86-88.

Outlines

/